亚洲成AV年一区二区三区,亚洲av日韩av中文综合,久碰香蕉在线观看不卡,欧美亚洲国产精品久久



Acceptance key points of UV air spraying automatic coating line
Time:2012-10-22 14:02:30

       At present, many companies use UV air spray automatic coating line (line), how to accept the UV automatic coating line is worth discussing. Let me start with a few points:


       1. Whether the line is running smoothly;

       2. Whether the exhaust air system is normal (such as the monitoring of wind direction and velocity between each tuyere and each region, etc., and the design of exhaust air pipe is reasonable);

       3. Whether the cleanliness, temperature and humidity of each area are up to standard and controllable;

       4. Whether the temperature of preheating and baking is within a reasonable range and controllable;

       5. Confirmation of spray gun and UV lamp (number and type, etc., whether the UV energy is up to standard and controllable);

       6. Whether the coating is thorough and excessive in UV curing;

       7. Whether the yield rate of the products tested is qualified.

Service hotline

020-36860788

WeChat

Feedback

Feedback

周宁县| 尼木县| 米脂县| 赤城县| 安丘市| 卢湾区| 辽宁省| 余庆县| 龙州县| 集安市| 房山区| 郓城县| 鄂伦春自治旗| 华池县| 甘洛县| 抚顺县| 灵台县| 驻马店市| 宿州市| 山丹县| 七台河市| 丹巴县| 乌鲁木齐市| 阳朔县| 宜君县| 平潭县| 通海县| 镶黄旗| 佛山市| 景东| 富裕县| 壶关县| 苍山县| 米泉市| 鸡东县| 绥芬河市| 资兴市| 丹阳市| 邛崃市| 南陵县| 山阳县|