亚洲成AV年一区二区三区,亚洲av日韩av中文综合,久碰香蕉在线观看不卡,欧美亚洲国产精品久久



Acceptance key points of UV air spraying automatic coating line
Time:2012-10-22 14:02:30

       At present, many companies use UV air spray automatic coating line (line), how to accept the UV automatic coating line is worth discussing. Let me start with a few points:


       1. Whether the line is running smoothly;

       2. Whether the exhaust air system is normal (such as the monitoring of wind direction and velocity between each tuyere and each region, etc., and the design of exhaust air pipe is reasonable);

       3. Whether the cleanliness, temperature and humidity of each area are up to standard and controllable;

       4. Whether the temperature of preheating and baking is within a reasonable range and controllable;

       5. Confirmation of spray gun and UV lamp (number and type, etc., whether the UV energy is up to standard and controllable);

       6. Whether the coating is thorough and excessive in UV curing;

       7. Whether the yield rate of the products tested is qualified.

Service hotline

020-36860788

WeChat

Feedback

Feedback

开鲁县| 钟山县| 克什克腾旗| 枣庄市| 德格县| 友谊县| 兴业县| 巴彦淖尔市| 沭阳县| 青铜峡市| 海城市| 年辖:市辖区| 武隆县| 天镇县| 罗山县| 石渠县| 高安市| 临沭县| 中方县| 清远市| 勐海县| 华蓥市| 金昌市| 宕昌县| 巩义市| 清远市| 奇台县| 巩留县| 济宁市| 夹江县| 黔西县| 巴中市| 敖汉旗| 全州县| 横峰县| 仲巴县| 万宁市| 淄博市| 巴中市| 通渭县| 垣曲县|